有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务

   2025-12-30 中国电力招标采购网dlztb0
核心提示:有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务基本信息项目名称 有限深圳开平11-4油田18-1区块开发项目

有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务

基本信息
项目名称
有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务
工程项目名称
有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务
项目概况
KP11-4 oil field block 18-1 development project is located in the Pearl River Mouth Basin . The average water depth within the oilfield range is about 500m.It is far away from existing facilities. KP11-4 oil field block 18-1 development project contains two blocks (1d/1dSa/3 block and 2d/5block). The project adopts the development mode of subsea production system tying back to the newly-built cylindrical FPSO, and adopts the centralised drilling centre arrangement scheme.1d/1dSa/3 block contains 18 production wells and two gas injection wells, and 2 reserved wells are considered; 2d/5 block contains 11 production wells, and 2 reserved wells are considered.The well fluids are collected in the underwater pipeline and connected back to the newly-built cylindrical FPSO through a newly-built multiphase pipeline.
项目所在地
广东省/深圳市
资金来源
企业自筹
资金落实情况
已落实
是否允许联合体投标
异议投诉
投标人或其他利害关系人认为招标文件内容违法或者不当的,对评标结果有异议的,应当在本系统以盖章后的书面形式提交,否则将不予受理。招标人无正当理由不在规定时间内答复异议的,对异议答复结果不认同的,投标人或利害关系人可向投诉受理部门投诉。
发布媒介
中国海洋石油集团有限公司采办业务管理与交易系统,中国招投标公共服务平台,中国海洋石油集团有限公司供应链数字化平台
标段信息
1. 有限深圳开平11-4油田18-1区块开发项目系泊系统独立校核及技术支持服务 标段
标段(包)编号
25-CNCCC-FW-GK-9992/01
发标日期
2025年12月30日
主要技术规格
所提供的系泊系统独立校核的工作方案和分析方法,应至少包含下述内容: 1) 系泊系统的计算模型基于试验结果进行校准; 2) 系泊系统强度与位移分析; 3) 系泊系统疲劳分析; 4) 中水浮筒局部水动力分析; 5) 系泊系统海底间隙分析; 6) 敏感性分析、浮筒连接链、三角板及附近系泊主链磨损分析;8) 平台链和浮筒连接链OPB疲劳分析9)合同要求的其他报告 2.2 Scope and Content of Services: Mooring System Independent Analysis’technical proposals (including methodology) should be at least included but not limited to following items: 1) Model calibration against model tests for Mooring system; 2) Mooring Strength and Offset Analysis ;3) Mooring Fatigue Analysis ;4) Mid-water Buoy Area Local Hydrodynamic Analysis ;5) Mooring Seabed Clearance Analysis; 6) Sensitivity Analysis ;7) Buoy Connecting Chains, Triangle Plate,and Nearby Main Chains Abrasion Analysis;8) Platform Chain And Buoy Connecting Chain OPB Analysis;9) Other reports required by the contract.
交货期/服务期/完工期
合同生效之日起,服务期限预计为两年(以实际项目工作进度为准)
交货数量
招标范围
所提供的系泊系统独立校核的工作方案和分析方法,应至少包含下述内容: 1) 系泊系统的计算模型基于试验结果进行校准; 2) 系泊系统强度与位移分析; 3) 系泊系统疲劳分析; 4) 中水浮筒局部水动力分析; 5) 系泊系统海底间隙分析; 6) 敏感性分析、浮筒连接链、三角板及附近系泊主链磨损分析;8) 平台链和浮筒连接链OPB疲劳分析9)合同要求的其他报告 2.2 Scope and Content of Services: Mooring System Independent Analysis’tec
出资比例
100%
生产能力
资格要求
1.如果投标人为境内注册公司:投标人具有合法有效的企业法人营业执照、税务登记证及组织机构代码证或证照合一的营业执照,投标时需提供原件扫描件(原件备查)。 投标人为事业单位的,应具有合法有效的事业单位法人证书,投标时需提供原件扫描件(原件备查)。 投标人为分公司的,提供具有合法有效的营业执照和上级法人单位授权书(授权该分公司投标),认可该分公司和上级法人单位的资质、资格和业绩,不认可同一上级法人单位的其它分公司的资质、资格和业绩,投标时需提供原件扫 描件(原件备查)。分公司与上级法人单位只可一家参与投标,同时参与投标的, 投标均无效。如果投标人为境外注册公司:投标人须提供有效的公司登记注册证明。2.业绩要求:投标人须满足以下业绩要求之一:(1)2011年1月1日至投标截止日(以合同签署时间为准,如未体现合同签署时间则以合同生效时间为准),投标人至少具有1个合同为带中水浮筒的聚酯缆永久系泊系统的设计或校核或延寿服务验收业绩(该合同非科研及概念设计,非安装工况);(2)投标人同时满足下述两项要求(如投标人提供的合同可在一个合同中同时体现下述两项要求的服务内容,则视为符合业绩要求):①2011年1月1日至投标截止日(以合同签署时间为准,如未体现合同签署时间则以合同生效时间为准),投标人至少具有 1个合同为聚酯缆永久系泊系统的设计或校核或延寿服务验收业绩(该合同非科研及概念设计);②2011年1月1日至投标截止日(以合同签署时间为准,如未体现合同签署时间则以合同生效时间为准),投标人至少具有 1个合同为带浮筒的悬链线永久系泊系统的设计或校核或延寿服务验收业绩(该合同非科研及概念设计,非安装工况)。投标人须按规定格式提交业绩表,并提交相关业绩证明文件。业绩证明文件包括但不限于:1)合同复印件(含合同签订时间页)和2)服务验收证明材料。投标人所提交的业绩证明文件必须至少体现以下内容:合同签署时间、项目名称及服务验收证明材料(可证明合同工作为系泊设计或校核或延寿工作,非安装工况内容)。若业绩合同为年度协议,除提供年度协议外,还应提供相应的已完工订单,订单内容或编号应与年度协议相关联。同一个年度协议下提供1个或以上的订单及与订单对应的服务验收证明材料均算为1个有效业绩。未提交业绩证明文件,或通过所提供的业绩证明文件无法认定满足上述业绩要求的,均视为无效业绩。投标人可提供独立业绩或联合体业绩均可,如投标人提供的业绩为联合体业绩,业绩应可体现投标人在该业绩中承担上述业绩要求职责的相关内容(非安装工况),否则联合体业绩无效Performance Requirements:Bidders shall satisfy one of the following performance requirements:(1) Between 1 January 2011 and the bid submission deadline (as evidenced by the contract signing date; where this is not specified, the effective date shall apply), the bidder must possess at least one contract for the design, verification, or life extension service acceptance of a polyester cable permanent mooring system incorporating a water-filled buoyancy chamber (excluding research or conceptual design contracts);(2) The bidder must simultaneously satisfy both of the following requirements (if the services listed below are covered within a single contract provided by the bidder, this shall be deemed to meet the performance requirement): ① Between 1 January 2011 and the bid submission deadline (as determined by the contract signing date; if this is not specified, the contract effective date shall apply), the bidder must possess at least one contract demonstrating acceptance performance for the design, verification, or life extension services of a polyester cable permanent mooring system (excluding research or conceptual design contracts,non-installation condition); ② Between 1 January 2011 and the bid submission deadline (determined by the contract signing date; if unspecified, by the contract effective date), the bidder must possess at least one contract demonstrating acceptance performance for the design, verification, or life extension services of a permanent chain-type mooring system with buoyancy units (excluding research or conceptual design contracts,non-installation condition).Bidders shall submit their performance records in the prescribed format, accompanied by relevant supporting documentation. Such supporting documentation shall include, but is not limited to: 1) copies of contracts (including the page indicating the contract signing date) and 2) service acceptance verification materials. The performance records submitted by bidders must demonstrate at least the following: contract signing date, project name, and service acceptance verification materials(which can be proved that contract content is mooring system design, verification, or life extension services,not installation condition). Where the performance contract constitutes an annual agreement, in addition to providing the annual agreement, corresponding completed orders must also be submitted. The content or order number of such orders shall be linked to the annual agreement. One or more orders provided under the same annual agreement, together with the corresponding service acceptance documentation, shall count as one valid performance record. Failure to submit performance documentation, or where the submitted documentation fails to demonstrate compliance with the aforementioned performance requirements, shall be deemed an invalid performance record.Bidders may submit either independent or consortium performance records. Should consortium performance records be submitted, they must demonstrate the bidder's fulfilment of the aforementioned performance requirements within that consortium project(non-installation condition). Failure to do so shall render the consortium performance record invalid.3.其他要求:是否接受联合体投标:否;是否接受分包:否。
招标文件领取时间
2025年12月30日 至 2026年01月06日

未曾在中国电力招标采购网(www.dlztb.com)注册会员的单位应先注册。登录成功后根据招标公告的相说明下载招标文件!

项目 联系人:李杨  
咨询电话:010-51957458 
传真:010-51957412 
手机:13683233285 
QQ:1211306049 
微信:Li13683233285 邮箱:1211306049@qq.com

备注:欲购买招标文件的潜在投标人,注册网站并缴纳因特网技术服务费后,查看项目业主,招标公告,中标公示等,并下载资格预审范围,资质要求,招标清单,报名申请表等。为保证您能够顺利投标,具体要求及购买标书操作流程按公告详细内容为准,以招标业主的解答为准本。

来源:中国电力招标采购网 编辑:cnooc
 